Tappe Architects has been selected by the Town of Millis and the MSBA Designer Selection Panel to complete the feasibility study and schematic design phases for the Clyde Brown Elementary School in Millis. The current school is on a campus with the Middle/High School and town recreational fields. Currently the school contains students from grades PK – 4. The feasibility study will study options for renovating or replacing the building along with the potential of relocating fifth grade from its current location in the Middle School back to the Clyde Brown which would result in a PK – grade 5 facility. It is anticipated that these early phases of design will be complete before the end of 2016.